Review clash report
- Last UpdatedNov 11, 2025
- 1 minute read
The clash report indicates the drawings that have been checked against the point cloud, and if the drawing is clash free. The parent group is displayed as a pass or a fail in the listing, and is highlighted as a green tick or a red cross. The group checked could be a drawing or a layer.
The clash report is displayed in the Clash Manager after a clash check. The group checked displays a red cross indicating a fail. You can expand the branch to look for individual objects causing concern.
For detailed information about interpreting and customizing these reports for project work, see AVEVA Point Cloud Manager Server - Show Clash Manager.