Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

View the bottleneck information for a line

  • Last UpdatedNov 01, 2024
  • 1 minute read

A line's bottleneck information is displayed at the top of its line pages, as highlighted below. In addition, the entity that is the bottleneck is indicated by the Bottleneck icon on its tile on the line's Entities tab, also highlighted below. If there are parallel entities at the bottleneck position, each entity will include the icon.

The MES Web Portal Operator Entities tab highlighting how to identify the bottleneck entity in a line.

If the bottleneck cannot be determined by the system, then a Note indicator appears in the Bottleneck position of the line summary information, as shown below.

The MES Web Portal Operator Entities tab Entity Summary highlighting the note indicator that appears in the bottleneck position when the line bottleneck cannot be determined.

To see why the bottleneck cannot be determined, hover the cursor over the message icon. A tool tip appears that explains the issue.

TitleResults for “How to create a CRG?”Also Available in