Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Link sample plan frequencies to a sample plan

  • Last UpdatedOct 28, 2024
  • 1 minute read

A sample plan frequency can be linked to a sample plan. Only one sample plan frequency of a given type may be linked to the sample plan, except for data change events, multiple data change events may be linked to the same sample plan.

You can add single frequencies for shift time, calendar time, entity run time, and entity production. You can add multiple frequencies for data change events to a sample plan as long as the data change events are for different events.

The Frequencies tab shows a list of all the sample plan frequencies linked to the selected sample plan.

Link sample plan frequencies to a sample plan

  1. Select the sample plan.

  2. Go to the Frequencies tab.

  3. Do one of the following:

    • Right-click in the tab and on the context menu click Add Link.

    • On the ribbon, go to the Current View tab and click Add Link.

    The Sample Plan Frequency Links dialog box appears.

  4. Optionally, specify search terms in the top pane to filter the list of sample plan frequencies to select.

    To list all available sample plan frequencies, do not specify any search terms.

  5. Click Apply Filters.

    The sample plan frequencies that are available to be linked to the QM specification and that match the filter if search terms were entered appear in the bottom pane.

  6. Select the sample plan frequencies you want to assign to the sample plan and click OK.

  7. Save the changes.

You can delete the sample plan frequencies assigned to a sample plan.

Related Links
TitleResults for “How to create a CRG?”Also Available in