Scenario 1
- Last UpdatedMay 17, 2023
- 1 minute read
Assume work order ABC is created from process P1 to make item I1, production is reported from the job for operation 10 with a reason code of R1, and the following dynamic routing parameters are set to No:
-
Redo job originating dynamic routing at end of dynamic process
-
Use label in dynamic routing work order or operation IDs
-
Combine dynamic routing from the same operations of different work orders
-
Copy remaining jobs to end of WO created for dynamic routing
The result is as follows, because the first row of the row of the dynamic routing usage table applies:

The dashed line represents the actual flow of the material to be reworked, though it will not appear on a routing diagram for either work order. The "1" for the identifier of the new work order assumes no other automatically-generated work orders have previously been created.