Switch jobs
- Last UpdatedNov 26, 2024
- 1 minute read
The Production Progress control shows information only for the current job and the current shift. If the Job Summary control is included in the form, and the current entity can run multiple jobs, and it currently has multiple jobs running, you can use the Job Summary control to change the current job by selecting a different job on the grid. The Queue control and Utilization control can also be used to change the current job if they are on the form. To do this, the current job would be ended using the Stop Job button that appears on the button bar of both of these controls. Then, on the Queue control, another job would be selected from the grid and the Start Job button would be pushed. The selected job will be started and set as the current job. On the Utilization control, the user would start a data entry job by clicking the Start Job button, which will open a dialog for entering data entry job information. Setting the information to the appropriate data entry job and clicking OK will start the job. You can also change the current job by using a script.