Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

OEE_Exec

  • Last UpdatedDec 18, 2018
  • 1 minute read

After "prod_uom":

  • Add "batch size" (tfloat, not nullable, default 1) to specify the standard batch size to which the production rate applies.

  • Add "std_item_id" (string40, nullable) to specify the item to which the production rate applies. FK to item. (Set null)

Related Links
TitleResults for “How to create a CRG?”Also Available in