Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Scenario 2

  • Last UpdatedMar 14, 2016
  • 1 minute read

Given the same conditions as in scenario 1, but assuming that the dynamic routing parameter Copy remaining jobs to end of WO created for dynamic routing is set to Yes instead of No, the result is as follows:

This is a more realistic scenario, because it is very unlikely that the work normally accomplished in operations 20, 30, and 40 is somehow done in a different way in operations 100 and 110, in addition to correcting the defect introduced in operation 10.

TitleResults for “How to create a CRG?”Also Available in