Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Line Production report variation - period layout

  • Last UpdatedDec 03, 2024
  • 1 minute read

An example of the Period layout, with tabular and chart data, is shown below.

  • The tabular Event Details section includes the following columns:

    • Production Day

    • Shift Name

    • Item

      The produced item.

    • Good

      Good production counts. Production count values are converted to the UOM of the line's standard item if one is defined.

    • UOM

      Unit of measure.

    • Reject

      Reject production counts. Production count values are converted to the UOM of the line's standard item if one is defined.

    • UOM

      Unit of measure.

  • The Production By Item chart shows the total Good and Reject counts for the selected shifts of each day in the specified time period.

  • To see a stacked bar's value, hover the pointer over the bar.

    The MES line production report by period layout.

TitleResults for “How to create a CRG?”Also Available in