Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Serialized items

  • Last UpdatedOct 28, 2024
  • 1 minute read

When dealing with serialized items, the dialog box for reporting production looks different. However, choosing a dynamic routing item reason for a unit’s production will have the same net effect. As noted in Modify lot numbers of dynamic routes, the dynamic routing parameter Modify lot numbers of dynamic routes does not affect serialized items, because each possible unit of production already has its own unique "lot" number, that being its serial number, and that will not change just because the unit is being reworked. Moreover, production of serialized items only really happens with a quantity of 1; it is not possible that half of a unit requires rework and the other half does not, because only one item reason can be entered for each unit.

TitleResults for “How to create a CRG?”Also Available in