Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Configure the Spec control

  • Last UpdatedNov 26, 2024
  • 1 minute read

The Spec control shows the specifications assigned to the active job, but not assigned to any particular step. You can do the following:

  • View and modify the minimum, maximum, and set point values.

  • View and modify attached files or comments or instructions.

  • View the actual value for the active job.

  • Change the specification guidelines, for a specified job or for subsequent jobs.

When you use the Spec control in a System Platform symbol, you can associate it with the Button Bar control. For more information, see Associate the Button Bar control with other controls.

This control corresponds to the Specs tab of the MES Operator application. For more information, see the Specs Tab section in the MES Operator Guide or online help.

Related Links
TitleResults for “How to create a CRG?”Also Available in