Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

ShowWOFlowDiagram() method

  • Last UpdatedNov 26, 2024
  • 1 minute read

Use the ShowWOFlowDiagram() method to open the Job Flow Diagram dialog box to show the flow diagram for the specified work order if the corresponding button is enabled.

Syntax

ShowWOFlowDiagram(woId);

Parameter

woId

A string that indicates the work order that the job flow diagram that is shown is for.

In This Topic
TitleResults for “How to create a CRG?”Also Available in