Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Configure Job Execution attributes

  • Last UpdatedDec 03, 2024
  • 2 minute read

You must specify the work order, operation, and sequence number to identify the job you want start, pause, or end on an entity.

The OCO object editor Job Execution attribute settings.

All the configured values in the parent template are automatically distributed to child templates and instances.

Work Order, Sequence Number, and Operation

The values or references for the work order ID, sequence number, and operation ID that specify the job to be run.

Job Position

The position at which to run the job on an entity. The default value is 0.

If an entity has one job position, then the value for the job position attribute must be 0. If the entity is capable of running multiple jobs at a time, then you must specify the job position to identify where the job should start, pause, or end on an entity.

Operator

The name of the operator who performs an action on a job, such as starting a job, ending a job, and adding production to a job.

The Operator attribute is used to track the user who performs an action on a job. If the operator name is not specified, the default operator name that is configured in the system User ID for Background Tasks attribute is used. If the default operator name cannot be retrieved from the system, the user name that is used to connect the MES database from the middleware server is used as the operator for a request that is initiated from OCO.

TitleResults for “How to create a CRG?”Also Available in