Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Std_Oper_Step

  • Last UpdatedDec 18, 2018
  • 1 minute read
  • Add "reqd_rep_pct" (tfloat, not nullable, default 0) before "spare1" to store the percentage of lots for which a repeatable step must be done; 0 if for all of them.

  • Remove the "script_id" field since the script table it references is being removed.

TitleResults for “How to create a CRG?”Also Available in