Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

RejectProduction() method

  • Last UpdatedNov 26, 2024
  • 1 minute read

The RejectProduction() method can only be called when the RejectProductionEnabled property is True. Use the RejectProduction() method to open the Reclassify Production dialog box that allows the reclassification of previously entered production. The dialog box will contain fields to set the amount of production to be changed, to select the reason code to associate with the production being changed, the item that is being produced, the lot, and the storage location for the produced item. The previously recorded values for these fields will be filled in when the dialog box is opened. Entering a quantity and clicking the OK button will update the production.

Syntax

RejectProduction();

TitleResults for “How to create a CRG?”Also Available in