Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Understand the control of serial number flow

  • Last UpdatedOct 28, 2024
  • 1 minute read

By default, linear flow is enabled for both hard and soft pegged methods of serialization. The produced serial numbers continue to flow in a linear order through the route. The linear flow does not prohibit the ability to transfer produced serial numbers to other operations within the same work order or different work orders based on system configuration settings.

TitleResults for “How to create a CRG?”Also Available in