Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Scenario 4

  • Last UpdatedMay 17, 2023
  • 1 minute read

Given the same conditions as in scenario 1 except that the dynamic routing parameter Use label in dynamic routing work order or operation IDs is set to Yes, and further assuming that production is reported from the job for operation 100 with a reason code of R1, the result is as follows. The third row of the row of the dynamic routing usage table applies to this latest production.

TitleResults for “How to create a CRG?”Also Available in