Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

InitEntitySelect() method

  • Last UpdatedNov 26, 2024
  • 1 minute read

Use the InitEntitySelect() method to display the entity list dialog, which allows you to do the following:

  • Select a different entity to use as the current entity

  • Log on or log off entities

  • Log off job, if job-based login is used

If an entity can capture utilization, the defined color of the utilization state of the entity is used for the text of the entity name.

Syntax

InitEntitySelect();

TitleResults for “How to create a CRG?”Also Available in