Combine dynamic routing from the same operations of different work orders
- Last UpdatedOct 28, 2024
- 1 minute read
Choices Are:
Yes/No
Default:
Yes
Enabled When:
Dynamic Routing is a separate WO from original is set to Yes
Meaning Depends on the Following Parameters:
None
Description:
This parameter controls whether rework that would differ only in the work order or operation from which they originated is added into an existing dynamic routing work order, or a separate dynamic routing work order is generated because of that difference. Additional quantity may only be added to an existing dynamic routing work order if none of that work order’s jobs have been started. If any of that work order’s jobs have been started, a separate dynamic routing work order is generated for additional rework quantity.
So, if this parameter is set to Yes and there already exist unstarted dynamic routing jobs corresponding to all (and only, for a given rework work order) those that would be created when a new amount of production is added, their amounts will merely be incremented by the amount of the new production. Otherwise, a whole new set is created. (When determining whether such jobs exist, all the unstarted jobs would need to exist in the same work order, but that rework work order would not need to have originally been generated by the work order from which this rework is originating; that is, the one for which production was entered.) Note that all aspects of the existing dynamic routing jobs have to match those that would be created, including their linkages, for them to be used instead of creating new ones.