Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Scenario 3

  • Last UpdatedMar 14, 2016
  • 1 minute read

Given the same conditions as in scenario 1, but assuming the dynamic routing parameter Redo job originating dynamic routing at end of dynamic process is set to Yes instead of No, the result is as follows. Note that the new job for operation 10 will get a new sequence number (1) even though it is at least initially scheduled to be done on the same entity as the original job for that operation.

TitleResults for “How to create a CRG?”Also Available in