Select an utilization event to split
- Last UpdatedNov 26, 2024
- 1 minute read
You must select an event in the Utilization grid to enable the Utilization Split button. You can edit the duration and shift information of the split events, based on the time boundaries and shift boundaries of the selected event.
Split an utilization event
-
Log on to the MES Operator, select an entity and then go to the Util/OEE tab.
-
Select a row from the Utilization grid and click Utilization Split.
The Utilization Split window appears. It contains four panes:
-
Utilization Events: The new events that are a result of splitting the selected event.
-
Comments: Comments about splitting the event.
-
Utilization Reason: The reason for the split event.
-
Selected Event: The controls for splitting the event. For more information, refer to Split an event.

-
-
Use the Selected Event controls to specify how to split the event.
-
Click Save.
The new utilization events are added to the Utilization grid.