Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Specify a re-entry route code

  • Last UpdatedOct 28, 2024
  • 1 minute read

Specify a re-entry route code for the dynamic routing usage entry

  • In the Re-entry Route Code box in the Properties window, select an existing route code or type a new route code.

    When the dynamic routing process completes, the reworked material will be returned to the downstream operation in the originating process that has been assigned that re-entry route code.

If no re-entry route code is entered or the entered re-entry route code is not found assigned to a downstream operation, the reworked material will be returned to the very next operation after the one from which the dynamic routing process originated.

Note: To avoid arbitrary apportioning of rework quantities across multiple jobs for an operation, the system requires that there be only one job for that operation at which rework is returned into the originating routing.

TitleResults for “How to create a CRG?”Also Available in