Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Genealogy by work order report data

  • Last UpdatedDec 03, 2024
  • 1 minute read

The report data consists of multiple expandable levels:

  • The first level is the work order and includes information about the operation and entity that ran the work order.

  • The second level is the item that was produced and includes information on when the job ran.

  • The final level is the produced lot level and includes information on the production reason for the produced transaction, the item grade and state, the entity to which the produced lot went, and the production quantity. Under this final level is a table of all the consumable items with information on the consumed lot number, the entity from which it was consumed, and the quantity.

    The MES genealogy by work order report layout.

TitleResults for “How to create a CRG?”Also Available in