Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Set the process level

  • Last UpdatedOct 28, 2024
  • 1 minute read
  • In the Properties window, select the level at which to organize the processes in the Level list.

Process levels are predefined. The following options are available in the list:

  • General

    For processes with no limitations (top-level and overall usage). By default, General is selected. General level processes consists of operations and steps with no entities assigned to the operation. You can clone the General operations and assign entities to them to create site level processes. You can also assign other entity specific properties to the process such as entity specification.

  • Site

    For site-specific variations (plant, region, and so on). You can clone the Site level Processes and assign items to the process to create master level processes that can be instantiated into jobs.

  • Master

    For equipment-specific variations (cell, manufacturing line, set of entities, and so on).

    Note: General and Site processes should not be instantiated into work orders.

Related Links
TitleResults for “How to create a CRG?”Also Available in