AVEVA™ Manufacturing Execution System 2023 R2

Standard hardware recommendations

  • Last UpdatedFeb 21, 2025
  • 1 minute read

For each of the servers, standard hardware is recommended in the Server topics in this chapter based on the following load:

  • Operations and Performance on 50 lines or machines (pieces of equipment), each with two application objects (100 MES application objects total)

  • Utilization events are generated at a rate of 1 event per minute per machine

  • OEE is calculated for each machine

  • One job is created per hour per machine

  • Inventory is received once per hour per machine

  • One item consumption event and two item production events are generated each minute for each machine

  • Discrete production is being collected

This standard hardware recommended here is just a guideline to help with purchasing decisions for new equipment. As each site is different, care must be taken to allow for expansion as needed.

Either Windows Server Standard or Data Center can be used.