Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Utilization Waterfall Chart report data

  • Last UpdatedDec 03, 2024
  • 2 minute read

This report shows the effective production time for an entity over a specified time period and how it was derived by showing cumulative totals for utilization states over that time.

The cumulative times can be shown in hours or as a percentage of the time period. When shown as a percentage, the chart removes the bars for idle time and includes bars for the target OEE performance value and the gap (difference) between the target and actual.

The MES utilizaton waterfall chart by hours report layout.

The bars in the chart by hours, from left to right, indicate the following:

  • The number of hours in the time period (maximum time).

  • Times for each of the Idle states, from most to least.

  • Production time.

  • Times for each of the production loss states, from most to least. This includes all components of OEE including downtime events, performance losses (running events as a single entry), and quality losses (bad counts as a single entry).

  • The effective production time

    Embedded Image (65% Scaling) (LIVE)

The bars in the chart by percentage, from left to right, indicate the following:

  • The total possible production time as 100% of the time period.

  • The percentages for each of the production loss states, from most to least. This includes all components of OEE including downtime events, performance losses (running events as a single entry), and quality losses (bad counts as a single entry).

  • The effective production percentage

  • The gap between the target OEE KPI percentage and the effective production percentage. The gap percentage is only shown if the target performance percentage is greater then the effective production percentage.

TitleResults for “How to create a CRG?”Also Available in