Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Tables for General System Parameters [6​.0 Appendix]

Tables for General System Parameters [6​.0 Appendix]

  • Last UpdatedDec 18, 2018
  • 1 minute read

The following changes were made to General System Parameter tables.

Attr Table

The enumeration "13=Shift" was added to the attr_grp column description.

Attr_Set Table

The display_seq column was added to the table.

TitleResults for “How to create a CRG?”Also Available in