Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Manufacturing Execution System 2023 R2

Understand the BOM tab

  • Last UpdatedOct 30, 2024
  • 1 minute read

The BOM tab is used for reporting consumption against the currently running job on the active entity. The consumption can be reported for a consumable Bill of Material item that is listed in the table. This consumption can also be recorded as scrap from this tab. You can set the default lot data to be used when reporting consumption from this tab.

The MES Operator BOM dialog used to report consumption for running jobs.

If a BOM item has substitute items, the Item field for that BOM item will have a list of the substitute items that can be selected. Once a substitute item is selected and is displayed in the grid, consumption and lot data can be applied.

TitleResults for “How to create a CRG?”Also Available in