Schedule properties
- Last UpdatedOct 28, 2024
- 2 minute read
-
Scheduled Start Date/Time
The date and time when the job should be started.
-
Latest Start Date/Time
The latest date and time when the job should be started to meet the work order's required finish time.
-
Scheduled Finish Date/Time
The date and time when the job should be finished.
-
Required Finish Date/Time
The latest date and time when the job should be finished to meet the work order's required finish time.
-
Schedule Pinned
Specifies whether the start time of this job cannot be changed.
-
Priority
The priority for this job to determine the job execution order. Priority is used to rate jobs, for example, which job is most important. You can also use this information for scheduling jobs.
-
Est. Setup Time
The estimated number of hours for setting up an entity to run this job.
-
Est. Production Rate
The estimated production rate for this job.
The estimated production rate must be greater than 0. An entry of 0 will cause an error.
-
Prod. Unit of Measure
The unit of measure (UOM) that is used for the production process.
-
Est. Variable Labor Rate
The estimated number of variable labor hours required to produce a single batch of the item on the selected entity.
-
Labor Unit of Measure
The UOM that is used for the labor involved with the production process.
-
Est. Teardown Time
The estimated number of hours required to teardown the selected entity after the production.
-
Est. Transfer Time
The estimated number of hours required to move the produced items from the selected entity to the next entity.
-
Est. Fixed Labor Hours
The estimated number of fixed labor hours required to produce a single batch of the item on the selected entity.