Conditions When an Entity’s Production Rate Cannot Be Determined

Conditions When an Entity’s Production Rate Cannot Be Determined

  • Last UpdatedNov 01, 2024
  • 1 minute read

If the production rate for an entity cannot be determined, then the line’s performance rate and bottleneck entity cannot be determined. Examples of this condition are:

  • An entity on which no job is running, there is no upstream job source for the rate, and a default rate has not been defined for the entity.

  • A job is running on an entity that produces an item that is different than the default standard item configured for a line and there is no conversion factor between the different units of measure of these two items.