Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Plant SCADA

Citect​.ini Parameters in Plant SCADA 2023 R2

  • Last UpdatedOct 13, 2025
  • 1 minute read

This topic lists the parameters that have changed in Plant SCADA 2023 R2.

New Parameters

The following parameters have been added to this release.

Alarm Parameters

[Alarm]UseInOperatorForGroupCommands

This parameter has been provided in Plant SCADA 2023 R2 Update 15 (delivered in October 2025). It controls whether the IN operator is used by Cicode alarm functions that can be passed a handle for a group that contains more than one item.

Note: Do not enable this parameter until all alarm servers in your system have been upgraded to Plant SCADA 2023 R2 Update 15.

General Parameters

[General]EnableIndustrialGraphics

This parameter has been provided in Plant SCADA 2023 R2 Update 15 (delivered in October 2025), to allow you to disable Industrial Graphics functionality within Plant SCADA configuration tools.

Removed Parameters

The following parameters have been removed from this release.

Alarm Parameters

[Alarm]EnablePrevRecordOptimisation

This parameter was used to control whether an optimization was used when communicating with older server versions. All supported versions now support this optimization, so it is always used.

Debug Parameters

[Debug]Kernel

You can no longer launch the Kernel at startup.

CSV_Include Parameters

[Alarm]ActiveHeading

The CSV_Include project is no longer supported by Plant SCADA as a system project.

[Alarm]DisabledHeading

[Alarm]SummaryHeading

[Alarm]HardwareHeading

[MultiMonitors]LastPageStackSize

[MultiMonitors]ScreenWidth

[Page]NewPageInBase

[Page]DelayRepaint

[Navigation]AlarmPage

[Navigation]DisabledPage

[Navigation]FilePage

[Navigation]HardwarePage

[Navigation]HelpPage

[Navigation]HomePage

[Navigation]MenuBackColour

[Navigation]MenuForeColour

[Navigation]MenuXPos

[Navigation]NetworkPage

[Navigation]MenuYPos

[Navigation]ProcessAnalystPage

[Navigation]SummaryPage

[Navigation]TrendPage

[Navigation]ToolsPage

[Printer]Port

[Privilege]EngTools

[TrendX]Duration

[TrendX]KeySeq

[TrendX]TagListEnable

See Also

What's New in Plant SCADA

In This Topic
TitleResults for “How to create a CRG?”Also Available in