Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Plant SCADA

Multiple Meter

  • Last UpdatedFeb 02, 2024
  • 4 minute read

Property

Description

Name

Multiple

Graphical Representation

Example Equipment Template

Two or three meter objects

Associated Composite Genie

Meter_Multiple.xml

Equipment.Items that the Genie expects

OP (see Control Meters - Common Elements)

ORHigh, ORLow, ORDsp (see Meter Common Elements)

PRHigh, PRLow (see Meter Common Elements)

OPTrack, PVTrack (see Meter Common Elements)

PV (see Meter Common Elements)

SP (see Control Meters - Common Elements)

FB (see Control Meters - Common Elements)

CtrlMode, CtrlModeDef (see Control Meters - Common Elements)

RunStatus (see Meter Common Elements)

EqStatus (see Status Indicators)

TrackDsp (see Meter Common Elements)

Equipment Parameters the Equipment Items Expect

InternalIODevice

CicodeIODevice

EqStatusFunc

CtrlMode

Range

Alarm Limits

See Equipment Configuration Parameters.

Associated Faceplate(s)

Analog Controller

Analog Indicator

Equipment.Items that the Faceplate Expects

OP (see Control Meters - Common Elements)

ORHigh, ORLow, ORDsp (see Meter Common Elements)

PRHigh, PRLow (see Meter Common Elements)

OPTrack, PVTrack, TrackDsp (see Meter Common Elements)

PV (see Meter Common Elements)

SP (see Control Meters - Common Elements)

CtrlMode, CtrlModeDef (see Control Meters - Common Elements)

AutoCmd, ManCmd, CasCmd

RunStatus (see Meter Common Elements)

OOS, OOSDisabled (see Equipment Running States)

Configuration Tasks

  1. Add Equipment Using Equipment Editor: Create the equipment for the required objects. Organize the equipment in a hierarchy. Objects can be referred to by their name when you add Composite Genies to a graphics page. You can add one or more instances of an equipment to a page.

  2. Equipment References: Create the required relationships (equipment references) between a piece of equipment to items of another piece of equipment. This allows you to refer to equipment.items outside of the equipment hierarchy.

  3. Configure PLC Limits with Equipment: This is an optional task that is required if you want to use PLC alarm limits instead of the standard analog alarm limits.

  4. Insert a Composite Genie: Create graphics pages with instances of Composite Genies that are associated with the equipment you have defined in your project.

  5. Create a New Faceplate: Add a faceplate for the equipment to allow operators to engage with the equipment at runtime.

  6. Write Cicode functions to initialize PR and OR values. Refer to the Cicode Reference documentation for more information.

Presentation Options

The following presentation options are available for this object.

Option

Description

Equipment Name

Enter a name for the equipment associated with the meter. You can enter a maximum of 160 characters for this option.

Note: The Multiple Meter equipment needs to be manually configured to reference the name of each meter to be included.

Meter Count

Number of meters - select from Duplicated for two meters or Triplicated for three meters.

Equipment #1/#2/#3 Name

Enter the name of the equipment object for the first/second/third meter (displayed only if meter count is triplicated). You can enter a maximum of 160 characters for this option.

Equipment #1/#2/#3 Prefix

Prefix applied to the equipment item name for the meters. This allows for displaying multiple values for a single piece of equipment. For example, you want to create three meters to monitor power, voltage and current for a single pump. You would create three meters on the pump and assign the equipment item prefix "Power", "Voltage" and "Current". So, the PV values for the meters would be PowerPV, VoltagePV and CurrentPV respectively.

Note: To get a meter with a prefix to work correctly, you need to create tags with the required item names. From the example above, you will need to create the tags PowerPV, PowerOP, VoltagePV, VoltageOP, CurrentPV, CurrentOP and so on.

The following equipment item names (where applicable) can be prefixed:

  • PV

  • OP

  • ORDsp

  • TrackDsp

  • FB

  • PRLow

  • PRHigh

  • ORLow

  • ORHigh

  • SP

  • PVTrack

  • FullScale

  • OPTrack

  • Timer

  • PVTarget

Meter Type

From a drop-down select one of the following meters: Level, Flow, Temperature, Pressure, Analyzer, Miscellaneous, and Deviation.

Size

Size of the meter object image - small or large

Orientation

Select the orientation that is appropriate for the presentation of the object on the graphics page.

Display Label

Use this setting to display a label at the selected position. Select None if you do not want to display a label.

Label

Enter the text that will display at the location specified in Display Label field. You can enter a maximum of 30 characters for this option.

Display Alarm Indicator

Shows or hides the Alarm Indicator which indicates the highest priority alarm and its state for this group of meters.

Display Setpoint

Select to display a setpoint indicator with the meter.

Display OOS

Select to display Out of Service indicator.

Mirrored

Inserts a mirror image of the meter based on the selected presentation options.

See Also

Meter Faceplates

In This Topic
TitleResults for “How to create a CRG?”Also Available in