Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Plant SCADA

Distributed I/O System

  • Last UpdatedJul 13, 2023
  • 2 minute read

This scenario demonstrates a method of connecting Plant SCADA to a number of devices that are distributed across several sites over a wide geographical area.

Instead of attempting to connect devices directly via a remote connection, an I/O server is placed at each site, enabling communication to be managed within the system.

Embedded Image (65% Scaling) (LIVE)

This model is also useful in plants that contain devices with a serial port or limited communications capabilities. By placing I/O servers on the factory floor to interface with these devices, you can optimize communications on slow or low-bandwidth networks and improve overall performance.

Despite the geographical distribution of I/O servers across many sites, this type of system can be configured as a single cluster system, as a cluster is able to support many I/O servers.

The diagram below demonstrates how to approach the deployment of this type of system across the server machines using a single cluster.

Embedded Image (65% Scaling) (LIVE)

A second cluster will only become necessary if your project requirements call for more than one redundant pair of alarms, trends or reports servers.

TitleResults for “How to create a CRG?”Also Available in