Run classical multi-period optimizations
- Last UpdatedAug 11, 2025
- 2 minute read
Several approaches can be taken to running a multi-period model, depending on whether you need to optimize all periods or only a sub-set.
Run all periods

By default all periods are run together as a single optimization. Ensure all periods are active on the Periods page and click the Optimize button.
Run a subset of periods

To optimize only a sub-set of periods:
-
On the Periods page, deactivate the periods which are not required.
-
Optimize the overall model.
Supplies, demands and constraints associated with the deactivated periods are ignored.
Run individual periods
It may be useful to optimize individual periods of a multi-period model, to ensure feasibility in these periods and to understand differences in multi-period results.
When a multi-period case is run individually, the case is run as a single-period optimization and so the results are not directly comparable. When a case is opened and run, the inventories are initialized using the original single-period entries, rather than the solution from the multi-period optimization.
To run a single-period and use opening inventories from a multi-period optimization:
-
Run the entire multi-period optimization.
-
On the Periods page, deactivate the other periods within the multi-period environment.
-
Optimize the single period in the multi-period environment.
Run as single-period plant
To optimize an individual period as a single-period plant:
-
Review the list of cases within the multi-period model.
-
Select the case and click Edit Plant. The plant case opens in a separate window.
-
Click Run to optimize.
Run original cases
As the multi-period model is based on several existing supply chain cases, it may be possible to run the case within the original model. To run the original case:
-
Review the model and case using the Plants page.
-
Locate the original model in the model list.
-
Open the relevant case from the case list.
Warning: The original model is independent from the multi-period model. Changes made in either are not synchronized. To understand the differences between the multi-period model and the original model, use Update Case.