Baseline
- Last UpdatedAug 11, 2025
- 3 minute read

A baseline is a snapshot of the scheduling case, as represented by tank amounts, compositions and property values, at a certain time during the scheduling period.
Baselines are useful to capture the status of the scheduling case before making changes, so that you can easily compare relevant quantities before and after the changes.
Note: AVEVA recommends that you ensure your database is up to date, by synchronizing your database using the Synchronize pane, before taking a baseline. For more details, see Multi User Collaboration.
The Baselines tab is the same as the Baselines page in the main scheduling environment.
You can use a baseline in the following ways:
-
In the Settings tab, you can choose to retrieve data from the staging database since the last baseline by selecting Since last baseline from the Time drop-down menu.
-
In the Charts pane (opened by clicking the Charts button in the Panes group of the Home ribbon tab) you can choose to show baseline times as vertical lines by clicking the Show baseline times icon (
).
-
In the Baseline tab, you can override simulated values by entering new values in the Value column.
Manage baselines
To create a baseline, follow these steps:
-
Click the
button. The Add New Baseline dialog opens.
-
Clear the Active check box if you want the baseline to be inactive. You can always change the active status later.
-
In the Time field enter the date and time of the baseline in the scheduling period.
-
Enter a Name for the baseline. The default name is the date and time of the baseline.
-
Optionally, enter a Description for the baseline.
-
Click OK. The Add New Baseline window closes and the new baseline is created.
To edit an existing baseline, select it in the drop-down menu and click the
button. The Edit Baseline window opens, which has the same fields as the Add New Baseline window.
To delete a baseline, select it in the drop-down menu and click the
button.
The baseline table fields
|
Item |
Description |
|---|---|
|
Source |
The source asset of the measurement. |
|
Destination |
The destination asset of the measurement. |
|
Type |
The type of measurement. Can be one of the following:
|
|
Details |
Details on the measurement:
|
|
UoM |
The unit of measure of the value. |
|
Simulated |
The value as simulated by the scheduling case. |
|
Snapshot |
The value as it was when the baseline was created. This is initially the same as the Simulated value, but the two values may diverge if the scheduling case is modified after the baseline has been created. |
|
Override |
An optional value you can enter to override the Snapshot value. |
|
Effective Baseline |
The effective baseline values. These correspond to the Snapshot values or, when present, to the Override values. |