Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ OSM Administration

Isolation Plans

  • Last UpdatedOct 19, 2023
  • 1 minute read

This topic relates to Isolation plans and isolation lists.

What is an Isolation Plan?

An isolation plan is a work plan to ensure that a certain piece of equipment has been isolated from other systems.

For example, an item of equipment has both water input and electricity input. Both of these systems need to be turned off before any work can be performed on the equipment.

An isolation plan usually contains one or more isolation lists of different types, such as an electrical isolation list to turn off the electricity and then turn it back on after work on the equipment is complete.

What does an Isolation Plan include

An isolation plan might include:

  • Description of work

  • Location of work

  • Equipment to be isolated

  • Purpose of work, or reason for doing work

  • Work steps (in Isolation List)

  • Risks and compensating actions

TitleResults for “How to create a CRG?”Also Available in