Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ P&ID

AVEVA P&ID 12​.4

  • Last UpdatedMay 22, 2025
  • 1 minute read

The following new functionality is delivered as part of this release.

ID

Description

3333176

New options at project administrator to setup and control highlight at drawing

When an Engineering Group is selected in the Engineer Explorer (see Engineering Groups in the Explorer), the entities in the group are highlighted on the drawing using a colour and line weight specified in the Project Configuration Category of the AVEVA P&ID Project Administration Program.

3333170

Reset highlighted entities in a drawing to default state

A new button has been added to the Engineer Explorer to remove highlighting from entities in Engineering Groups and revert them to their default colours and line weights. Refer to Engineering Groups in the Explorer for details.

3654796

Upgrade interfaces using HTTP path to HTTPS path

As of AVEVA P&ID 12.4, security for the AVEVA P&ID Report Service has been enhanced with the option of using the HTTPS protocol. Refer to Enable the HTTPS Protocol for the AVEVA P&ID Report Service for details.

TitleResults for “How to create a CRG?”Also Available in