Convert Project Label Units

  • Last UpdatedMar 14, 2024
  • 1 minute read

Changes to drawings resulting from the label units project configuration setting being changed are not automatically implemented when project drawings are loaded. The user must trigger these changes "manually" in each drawing after it has loaded using this procedure.

Associated Project Configuration Options

This procedure is used to implement changes resulting from the Label Units setting in the Project Configuration Category of the AVEVA P&ID Project Administration program being changed.

Procedure

  1. Start the procedure by selecting the Convert Units option in the Project Configuration group of the Utilities tab.

  2. The command prompt will display:

    Select objects or <select all>:

    Select the labels which are to be updated. When all the required labels have been selected, press Enter.

    If all labels on the drawing are to be updated, enter all at the command prompt and press Enter. It is recommended that a Zoom Extents is performed before proceeding with this option.

  3. The command prompt will display the number of selected labels (for example):

    5 found

    The selected labels are then updated. If many labels have been selected, this may take a few moments.