Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ P&ID

Restore Drawing Revisions

  • Last UpdatedMar 14, 2024
  • 1 minute read

Previous revisions of drawings may be restored from the Document Manager. This feature does not overwrite the current revision of a drawing, it makes the drawing file of an older revision available to users to open and view.

To restore a drawing revision, right-click on its record and select the Restore option from the menu that is then displayed.

Embedded Image (65% Scaling) (LIVE)

A message is then displayed saying that the drawing has been restored.

Restored drawing files (.dwg files) are placed in the project Drawing Location folder (as set in the Project Configuration Category of the AVEVA P&ID Project Administration program) in a sub-folder called RestoredDrawings.

Related Links
TitleResults for “How to create a CRG?”Also Available in