Draw Revision Clouds
- Last UpdatedMar 14, 2024
- 1 minute read
This procedure is used to highlight changes from a previous revision of a drawing by adding a cloud of any size around the desired area. Clouds can only be deleted as a complete entity using the AVEVA P&ID delete facilities and cannot be copied or broken. Clouds should always be drawn in a clockwise direction.
Example

Associated Project Configuration Options
The drawing layer for revision-related entities such as revision clouds is selected in the Miscellaneous - Labels Sub-Category of the AVEVA P&ID Project Administration program.
Procedure
-
Start the procedure by selecting the Revision Cloud option in the Symbol group of the Home tab.
-
The Command prompt will display:
Indicate point for cloud (Enter 'C' to close):
Pick points in a clockwise direction until the cloud is large enough and then enter 'C' to close it.