Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ P&ID

Draw Revision Clouds

  • Last UpdatedMar 14, 2024
  • 1 minute read

This procedure is used to highlight changes from a previous revision of a drawing by adding a cloud of any size around the desired area. Clouds can only be deleted as a complete entity using the AVEVA P&ID delete facilities and cannot be copied or broken. Clouds should always be drawn in a clockwise direction.

Example

Embedded Image (65% Scaling) (LIVE)

Associated Project Configuration Options

The drawing layer for revision-related entities such as revision clouds is selected in the Miscellaneous - Labels Sub-Category of the AVEVA P&ID Project Administration program.

Procedure

  1. Start the procedure by selecting the Revision Cloud option in the Symbol group of the Home tab.

  2. The Command prompt will display:

    Indicate point for cloud (Enter 'C' to close):

    Pick points in a clockwise direction until the cloud is large enough and then enter 'C' to close it.

In This Topic
Related Links
TitleResults for “How to create a CRG?”Also Available in