Turn Break Symbols On and Off
- Last UpdatedMar 14, 2024
- 1 minute read
This procedure is used to switch on or off the depiction of pipe breaks with symbols instead of a gap.
For details of the use of this procedure in the context of drawing P&IDs, refer to Draw Pipes and Process Links.
Associated Project Configuration Options
The symbol used to depict pipe breaks is selected in the Pipes – Settings Sub-Category of the AVEVA P&ID Project Administration program must be checked.
Procedure
-
Start the procedure by checking or unchecking the BREAK with SYMBOL checkbox in the Pipeline group of the Home tab.
-
The depiction of pipe breaks with a symbol instead of gap is then immediately be switched on or off.