Unlink Assigned P&ID Data Grid Items from Symbols and Pipes
- Last UpdatedMar 14, 2024
- 1 minute read
This procedure is used to remove the link between symbols and pipes on drawings, and items in the P&ID Data Grid.
For details of the use of this procedure in the context of drawing P&IDs, refer to Insert Unassigned P&ID Database Items.
Procedure
-
Start the procedure by opening the P&ID Data Grid and accessing the Assigned node under the AVEVA P&ID Database node.
-
The nodes list all assigned symbols by type. Select the required item so that its details are displayed in the right-hand window of the grid interface.
-
Right-click on the record in the right-hand window and select UnLink from the menu that is then displayed:

Note: Inline items cannot be "unlinked". An error message is displayed if this is attempted.
-
The link between the symbol or pipe and the item in the grid is removed, and the item is moved from under the Assigned to under Unassigned node.
Note: Unassigned items in the grid can subsequently be placed on the drawing using the Insert Unassigned P&ID Database Symbols and Insert Unassigned P&ID Database Pipes procedures, or linked to unlabelled items on the drawing using the Link Unassigned P&ID Data Grid Items with Unlabelled Drawing Items procedure.