Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ P&ID

Check for Corrupted Items

  • Last UpdatedMar 14, 2024
  • 1 minute read

This procedure is used to check the drawing for corrupted items.

Procedure

  1. Start the procedure by selecting the Audit option in the Project Configuration group of the Utilities tab.

  2. All "intelligent" items on the drawing, both pipes and symbols, are then checked. If any are found to be corrupted, an error balloon is placed at item insertion point, displaying the following message:

    ERROR: 381 Entity is Corrupted, Please Delete it from Drawing. - Handle: [item handle]

Related Links
TitleResults for “How to create a CRG?”Also Available in