Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ P&ID

Label Revision Triangles

  • Last UpdatedMar 14, 2024
  • 1 minute read

The labelling procedure can be used to place the revision text associated with the revision triangles. When a revision triangle is labelled, it is automatically labelled with a letter or number which is a reference to the revision text. This number can be changed if required.

Revision triangle data cannot be edited once it has been placed. The revision number inside the triangle is associated with the triangle and neither can be deleted separately. Instead, they must be deleted as a single item by selecting the Delete option from The Drawing Page or Engineering Explorer menus for the item.

Revision text is also be deleted as a single item.

If an attempt is made to label two revision triangles with the same revision number/letter, or if the revision number, reviser and description are not completed, an error message will be received.

Refer to Label Revision Triangles.

Related Links
TitleResults for “How to create a CRG?”Also Available in