Source, Supply and Load Assignment
- Last UpdatedMar 14, 2022
- 1 minute read
Before cable sizing calculations can take place, the load must be defined and connected to the supply and the supply must connected to source equipment. In AVEVA Electrical the types of supplies/sources are Generator, Transformer and Source.
Note:
If load is connected either to a transformer, generator or source which has no impedance
values set, the short circuit values cannot be calculated.