Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Project Tab in Electrical Wiring Manager

  • Last UpdatedAug 08, 2025
  • 1 minute read

The Project tab includes the following Electrical Wiring Manager-specific options:

Setup Sub Menu:

Ferrule Rule Definitions

Displays the Ferrule Rule Definition window which is used for creation or modification of Ferrule Rules. The Ferrule Rules feature enables automatic ferrule numbers (wire number markings) to be added to wire ends after termination.

Wiring Rule Definitions

Displays the Wiring Rule Definitions window which is used for creation or modification of Wiring Rules. The Wiring Rules feature is used to automatically create equipment cables and to terminate cable cores/wires at each end.

AVEVA Cable Design Import Configuration

Displays the AVEVA Cable Design Import window. Refer to AVEVA Cable Design Data Interface.

TitleResults for “How to create a CRG?”Also Available in