Create Wiring for a Multiple Loads
- Last UpdatedJul 17, 2025
- 2 minute read
Before proceeding, for all loads for which wiring is to be created:
-
Assign supplies (refer to Assign Loads to Supplies), and
-
Assign wiring rules (refer to Assign a Wiring Rule to Loads).
In the Loads List, select the loads for which wiring is to be created.
Click Create Wiring in the Actions section of the List Tools - Loads tab. The Create Electrical Wiring window is then displayed.

Note:
Any existing wiring for the selected loads will be overwritten by this procedure.
-
All the selected loads are listed. If a wiring rule has not been assigned to a load, this is indicated in the Result column. Also, the checkbox in the Select column will be unchecked for such loads.
-
If required, a wiring rule can be applied to a load (or a different rule applied) by selecting it from the Wiring Rule Name field.
To continue, click Create. Wiring is then created for each load for which a rule has been assigned, except for those loads with no supply assigned, as indicated in the Result column:
