Equipment Arrangement
- Last UpdatedJul 30, 2025
- 1 minute read
To rearrange the internal equipment drag and drop components from DIN Rail to DIN Rail or up and down a DIN Rail.
Note:
Electrical Wiring Manager always inserts new or dropped components before the component dropped on or right-clicked
on.
Note:
A DIN Rail is automatically added whenever a new component is added to a new 'column'
or an existing component is dragged to a new 'column' within this layout.
Equipment shared with AVEVA Instrumentation can be viewed in AVEVA Instrumentation but not edited.