Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Loads Assigned Tab in Load Detail Window

  • Last UpdatedJul 17, 2025
  • 2 minute read

Defines the load assignment to link a load to the current load, so that the current load is effectively the supplier of the linked load.

To assign a load to the current load, click Assign:

  1. The Assign Load window is displayed:

    Note:
    Only a single load can be assigned in this way. If the load already has a load assigned to it, an error message is displayed.

  2. To select a load, double-click on the required load or click on it and then click Assign.

  3. If, with the addition of the selected load, the sum of the rated power of the loads assigned to the supply would be greater than the current load’s rated power, a warning message is displayed, For example:

  4. Click Yes to assign the load anyway or No to cancel.

  5. The selected load is then displayed on the tab:

To un-assign a load, select it and click the Un-Assign button. A message is displayed requesting that the un-assignment be confirmed. Click Yes to continue.

TitleResults for “How to create a CRG?”Also Available in