Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Edit Packages and Package Equipment

  • Last UpdatedJul 23, 2025
  • 2 minute read

Edit packages and their equipment as described in this topic.

Edit a Package

To edit a package, highlight it in the Packages List and click Edit in the Records section of the Home tab, or double-click on the package record.

The Equipment Package window is then displayed. Refer to Add Equipment Package. Edit the package details as required.

Edit Package Equipment

To edit equipment in a package, double-click on it in the lower grid of the Packages List.

If the equipment is a load or a supply, the Load Detail window or Supply Detail window is displayed as appropriate. Refer to Edit a Tag in the Loads List and Edit a Tag in the Supplies List for further information.

If the equipment is a field device, local control station and PLC cabinet from Electrical Wiring Manager, the Equipment Detail window is then displayed.

Equipment Tab

The Equipment tab displays basic details of the equipment. Amend these as required.

To access more detailed data for editing, access as required the Load Detail window or Supply Detail window from the Loads list or the Supplies list (refer to Edit a Tag in the Loads List and Edit a Tag in the Supplies List for further information), or the appropriate window in Electrical Wiring Manager.

Properties Tab

In the Properties tab to enter additional equipment and process data properties as required. Click on the appropriate Select Properties Type option and enter or edit values as required.

Property names are setup from the Property Definitions option on the Project tab. Refer to Property Definitions for further information.

Last Edit Field

The Last Edit field displays the date and time when the equipment data was last edited. The user name of the individual that performed the edit is displayed in a tool-tip when the mouse cursor is hovered over the field. Click the button in the field to display the Audit Manager, which will display a list of all the changes to the load data.

Attached Documents Link

This link is used to access the Attached Documents window, which is used to attach documents to the equipment and the a list of documents already assigned. See Attachments (External Documents) for details.

The number next to the link is the number of documents currently attached to the equipment.

Related Links
TitleResults for “How to create a CRG?”Also Available in