Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA™ Electrical

Drag and Drop Equipment to Enhanced Block Diagrams

  • Last UpdatedAug 04, 2025
  • 1 minute read

To add existing equipment and cables to the Enhanced Cable Block Diagram by dragging and dropping:

  • In the Equipment View, click on an Equipment node, drag the selected Equipment node onto the diagram and drop it into the diagram.

  • Or, in the Equipment List, click on an Equipment record, drag the selected Equipment record (select just to the left of the 'Pin' icon) onto the diagram and drop it into the diagram.

  • Or, in the Cable Schedule, click on an Cable record drag the selected Cable record (select just to the left of the 'Pin' icon) onto the diagram and drop it into the diagram.

Electrical Wiring Manager will then add the selected equipment or cable, and depending on the preferences set, all connected Equipment and Cables as shown in this example:

In the above example Equipment node 01-JB-001 was dragged from the Equipment View to the Diagram and all its interconnected equipment was added to the left and right along with all interconnecting cables.

Note:
Whether or not interconnected equipment etc. is added is controlled by a Options setting. A separate option to specifically exclude field devices from being added is also available.

TitleResults for “How to create a CRG?”Also Available in